
as compared to the original trim work in the downstairs bathroom (with brand-new frosted glass window).

pretty money, huh?



http://www.brooklynlimestone.blogspot.com/
http://www.thisoldhouse.com/
that yellow thing at the front of the frame is the drywall lift. read: best machine EVER.
sun! in portland!
note pawprints on ceiling. huck was extremely helpful, especially when drew was trying to cut the drywall.
despite worrying that the salvage gods would rain down hatred upon me for doing so, i decided to paint the original, unlaquered brass feet of the tub a rich, glossy espresso brown, mostly so the brass wouldn't conflict with the nickel and chrome finishes in the rest of the bathroom. turned out really well, salvage gods be damned.
how things looked as of 6 pm tonight, facing the linen closet and future sites of the tub (left side) and toilet (right). the entire room now has walls! very advanced. next up, mudding.